Rehabilitation of Engine Company 80
New York, NY
Via NYC DDC and FDNY, executed designs for complete gut rehab of three-story, 20,000 SF firehouse including new functional spaces and state-of-the-art equipment.
Memorial Field Fieldhouse
Hillsdale, NJ
AIA Design Award This 4,800 SF building has special plastic continuous roof ridge skylights over the attic storage, the 2-story multi-purpose room and on the dormer skylights at the snack bar. Colored concrete blocks, solid glass blocks for vandal-proof 'windows,' and metal roof were used to keep costs low.
Science Library at S.U.N.Y.
Binghampton,NY
Project architect for new 50,000 SF biology-psychology library portion of campus development, inclusive of an enclosed bridge linking all buildings. Davis Brody Associates.
 
Addition to the Greenwood Lake Library
Greenwood Lake, NY
3,000 SF addition includes a 1,800 SF community room used for theater performances, art shows, cooking classes, etc. The hip roof design compliments the existing building and respects the contextuality of the neighborhood.
Washington Center Parking Structure
Newburgh, NY
Prefabricated brick panels of this 134 car, 2-story municipal parking garage match the 4-story office building above and respect the local historical area. Association with Robert Lamb Hart, Planners.
Centennial Field House
Hillsdale, NJ
A 2,500 SF building on landfill includes locker rooms, toilets and a food concession, bearing on wide beam-like foundations. The building can be jacked-up to level if settlement occurs.
 
Stonybrook Swimclub Bathhouse
Hillsdale, NJ
The 3,800 SF building provides all facilities for this suburban pool club. Low cost industrial materials were used, such as colored concrete block, metal roof, translucent plastic skylight dormers and glass block vandal-proof 'windows.'
Hackensack City Hall Renovation
Hackensack, NJ
The space plan for reorganizing 90,000 SF of municipal spaces resulted in a phased 23,000 SF renovation modifying the Council Chambers & Meeting Room, the Courtroom and new Police locker rooms. Restoration of the historical exterior consisted of window replacements and masonry cleaning.
Homecrest Branch Library Renovation
Brooklyn, NY
Complete 'gut' rehabilitation of this 5,300 SF branch library, inclusive of toilet renovations, new HVAC systems, new stacks and renovations to the exterior was built for 78% of New York City's budget.